- Study and project for the railway subway at Treponti -
(Pesaro) Client: Lanari Firm - Ancona Period: 1983
- Study, and project of the railway subway at Riccione (Via
Emilia) - (Rimini) Client: Commune of Riccione Period:
1983
- Study and project for the doubling of the railway line
"Bologna-Padua" "Argelato-Funo"
section (Bologna) Client: Coopfer Co-operative - Bologna
Period: 1983
- Study, project for the Railway yard of Bologna (Bologna)
Client: Coopfer Co-operative - Bologna Period: 1983
- Study, project and various services for the doubling of
the railway line at Piombino Client: Cisa - Italy Period:
1982-1983
- Study and preliminary design for 3 solutions concerning
the railway line Perarolo-Calalzo (Belluno) Client: Cisa
- Italy Period: 1983
- Geotechnical study and project of the settlement works
for a railway bridge on Trigno river - (Pescara) Client:
Sicos S.p.A. - FF.SS. - Department of Ancona Period: 1981
- Study and final design of the strengthening works of the
railway bridge on Santerno and of the railway bridge on
Sillaro river (Bologna) Client: Sicos S.p.A. - FF.SS. -
Bologna Period: 1976
- Study and final design of Torricella-Libiano road
(Pesaro) Client: Commune of Novafeltria Period: 1974
- Preliminary Study of the S. Angelo in Vado - Lunano
highway (Pesaro) Client: Minister of Public Works -
Department of Pesaro Period: 1973
- Study, project, and technical support during the
execution of the E7 highway "Ravenna-Cesena"-
Lot V Client: Ferolla Firm - Naples Period 1974
- Study, project, and technical support for the S. Monica
circuit - Misano (Rimini) Client: S. Monica S.p.A.
Period: 1968-1973
- Study, project and technical support for the E7 highway
"Cesena-Ravenna" Lot V Client: Burgagni and
Rossini Firm - Pesaro Period: 1978
- Study, geotechnical project, and final design of the
landslides at "Rotella" on the State Road SS.
433 (Ascoli Piceno) Client: ANAS - Ancona Period: 1981
- Study, project, geotechnical service and foundation
project for the State Road SS. 356 at Cividale - Variant
road with viaducts and bridges (Udine) Client: CISA Italy
- ANAS - Trieste Period: 1982-1983
- Study - geotechnical services in connection with the
final project for the State Road SS 1
"Aurelia". Improving works between Follonica
North and S. Vincenzo North - Lot VII - VIII - IX - X
(Grosseto) Client: ANAS - Florence Period: 1986
- Study geotechnical services in connection with the final
project for the State Road SS 1"Aurelia".
Improving works between S. Vincenzo North and Cecina -
Lot XI - XII- XII (Livorno) Client: ANAS - Florence
Period: 1986
- Study geotechnical services in connection with the final
project for the State Road SS1 "Aurelia".
Improving works between Grosseto and Follonica. Variant
track external to the town of Grosseto (19+644 Km) - Lot.
I° and II° Client: ANAS - Florence Period: 1986
- Study, project ,geotechnical services and foundations
project of "Verucchio" bridge on the Regional
Road SP. 25 Client: Province of Forlì Period: 1975
- Study, geotechnical services, preliminary and final
design of the inlet tunnel of "Ca' Morollo"
mine. Client: CBD S.p.A. Period: 1961
- Study, geotechnical services, preliminary and final
design of the inlet tunnel of "Villa" mine
Client: CBD S.p.A. - Forlì Period: 1963
- Study, geotechnical services, preliminary and final
design of the inlet tunnel of "S. Donato" mine
Client: CBD S.p.A. - Forlì Period: 1964
- Study, geotechnical services, preliminary and final
study, consulting for the intake tunnel of Campoligure
(Genoa) Client: S.a. Turchino - Genoa Period: 1962-1968
- Study, geotechnical services, preliminary and final
design as well as works supervision of the intake tunnel
of S.Anna (Pesaro) Client: Furlo' s Springs S.p.A.
Period: 1969-1972
- Study, geotechnical services, preliminary and final
design, works supervision of the mineral water intake
tunnel "La Castellana" - Tavoleto (Pesaro)
Client: Castellana's Springs Period: 1971-1973
- Study, geotechnical services, preliminary and final
design of the "Rio Canale" diversion tunnel -
(Ascoli Piceno) Client: Reclamation Consortium of river
Aso - Pedaso Period: 1978-1982
- Study, geotechnical services, preliminary and final
project for the "Senatello" diversion tunnel -
(Pesaro) Client: Reclamation Consortium of Appennino
Pesarese - Pesaro Period: 1980-1982
- Study, geotechnical services, preliminary study for the
"Parchiule" diversion tunnel (Pesaro) Client:
Reclamation Consortium of Appennino Pesarese - Pesaro
Period: 1983
- Study, geotechnical services, preliminary and final
design for the "Barchi" diversion tunnel -
(Pesaro) Client: Reclamation Consortium of Appennino
Pesarese - Pesaro Period 1979
- Study, geotechnical services, preliminary project for the
"Orsaiola" diversion tunnel - (Pesaro) Client:
Reclamation Consortium of Appennino Pesarese - Pesaro
Period: 1983
- Study, project, geotechnical services, calculations for
the Hydroelectric power station, as well as tunnels at
Presenzano (Garda lake diversion tunnel to Adige river)
(Verona) Client: C.M.C. - Ravenna Period: 1983
- Study, geotechnical services and preliminary study of a
precast tunnel at the port of Ravenna. (This works has
been published by "Quarry and Construction")
Client: Setramar - Ravenna Period: 1978-1980
- Study and geotechnical project of the Targia tunnel -
(Syracuse) Client: Collini Firm - FF.SS. Period:
1984-1985
- Geotechnical services - foundations - strengthening works
for the variant railway line at Targia - (Syracuse)
Client: Collini - Romagnoli - Lodigiani Associated
Period: 1984-1985
- Study, geotechnical services and technical support in
connection with railway tunnel of Perarolo - Calalzo
(Belluno) Client: Cifa - Rome e Cisa - Udine Associated
Period: 1984-1985
- Study, geotechnical project of the tunnel on the State
Road "Castel di Sangro" (Isernia) Client:
Saiseb - Rome Period: 1985
- Rail link Treviso - Calalzo - final project of the
variant rail link between Km 118+700 and Km 124+850.
Mount Zuco tunnel and pilot tunnel, Cidolo tunnel,
Perarolo tunnel. Client: IN.CO. Period: 1991 - in course
- Road "Fondo valle Sauro" - Lot. I: Corleto
Perticara - Laurenzana segment Project for the cross
tunnel and geotechnical services. Client: Potenza Strade
(Furlanis - Del Favero Association) Period: 1992 - in
course
- Project of river "Foglia" bridge and of river
"Ordocione" (Dx Foglia) bridge at Pontevecchio
(Pesaro) Client: Reclamation Consortium of Appennino
Pesarese - Pesaro Period: 1990
- Geotechnical services for A14 motor-way Bologna - Bari -
Taranto. Widening to 3 lane works - lots 1 -9 Commission
S.P.E.A. Client: various Period: 1998-1991
- San Remo variant to State Road SS 1 "Aurelia".
Geotechnical study for preliminary and final project of
tunnels and foundation works. Final project for Bussana,
Poggio, Ratella, San Remo tunnels Client: C.I.L.T.
Period: 1992 - in course
- San Remo variant to State Road SS 1 "Aurelia" -
Arma di Taggia - Ospedaletti segment. Interchange of San
Martino di San Remo. Final Project of Bussana, Poggio e
Ratella tunnel, Final Project of Valle Armea ,Val d'Olivi
e S. Martino Viaducts foundation, Final project for the
Villetta tunnel and pilot tunnel - S. Giacomo tunnel and
pilot tunnel - Interchange of S. Lazzaro (Imperia)
Client: C.I.L.T. Period: 1990 - in course
- Motor-way link between Lucca and Altopascio with
ramification toward "Garfagnana" Geotechnical
study for preliminary and final project for the cut and
cover tunnels and foundation works. (Lucca) Client:
C.I.L.T. Period: 1990-1992 - in course
- Sestri Levante - Livorno and Fornola - La Spezia
motor-way Link with the port of La Spezia - State Road SS
331. Geotechnical study and project for the
infrastructures and a tunnel under the port of la Spezia
(La Spezia) Client: C.I.L.T. Period: 1990-1992 - in
course
- Alternate track to State Road SS 1 "Aurelia"
Celle Ligure - Vado segment Geotechnical study for the
final project Client: CO.AL.P.A. Period: 1989 - in course
- Road link between A10 interchange and State Road SS 1
"Aurelia" in Alassio Lot I°. Study and final
project for the Bastia 1 and 2 Tunnel and foundation of
river Neva bridge. (Savona) Client: Villanova 92 Society
Period: 1990-1992 - in course
- Dei Fiori motor-way - alternate track to State Road SS 1
"Aurelia" - Lot II°- Villanova d'Albenga -
Alassio - Geotechnical study for final project (Savona)
Client: CO.AL.P.A. Period: 1989
- Dei Fiori motor-way - Alternate track to State Road SS 1
"Aurelia" - Finale Ligure - Marina d'Andora
segment stretch: Villanova d'Albenga - Alassio I°
section from 0.00 m to 7163.7 m Study, final design for
the: cut and cover Villanova - cut and cover Isoleri -
Alassio 1 - Alassio 2 - tunnel - Alassio pilot tunnel and
Arroscia, Lerrone, Garscini and Rio Caso viaducts
foundations (Savona) Client: Villanova 92 Bis Society
Period: 1990 -1992
- Sestri Levante - Livorno motor-way - ramification for
Viareggio, Lucca and La Spezia A12 interchange for
Florence Livorno speedway - geotechnical study for the
preliminary and final project of the entire work
(Livorno) Client: EDI.STRA Period: 1989 - in course
- Geotechnical study for the preliminary and final project
for the Livorno - Civitavecchia motor-way. Lot III - 1°
segment Client: C.M.C. - Ravenna Period: 1989-1991
- Urgent works in connection to the strengthening of the
State Road SS 321 "del Polacco" from cross-road
State Road SS 2 "Cassia" to S. Casciano di
Bagni. Client: Polacco Soc. Cons. Period: 1992 - in
course
- State Road SS 1 "Aurelia" - Improving works in
the Grosseto - Follonica stretch - Final geotechnical
project for lots 1 and 2. (Grosseto) Client: Lodigiani -
Todini Firms Association Period: 1990 - in course
- State Road SS 1 "Aurelia" - Improving works in
the Follonica - Cecina section - State Road SS. 439,
Valmaggiore ditch stretch - lot VI-A. Final project for
the Poggio Bastione tunnel and geotechnical services
concerning the route. Client: Follonica scarl Period:
1992
- Geotechnical and structural project, project of the
tunnels, for the State Road SS 12 "of Abetone and of
Brennero" - Ponte a Moriano section (Lucca) Client:
CO.GE.I. Period: 1990 - in course
- Final project of the improving works of the Sienna
Bettolle highway from Km 0.00 to Km 44+525. (Sienna)
Client: Fagotti Firm Period: 1990 - in course
- Link between Genoa airport interchange of A10 motor-way
and State Road SS 1 "Aurelia", the C. Colombo
Airport, the "sopraelevata" and the State Road
SS 35. Final design of the Coronata and Colombara tunnels
and of the viaducts foundations (Genoa) Client: C.I.L.T.
Period: 1990-1992
- Salerno Reggio-Calabria motor-way. Urgent works of
strengthening of the San Salvatore, Caduti Sul Lavoro and
Pecorone viaducts Client: S.I.R. - Genoa Period: 1990 -
1992 - in course
- Speedway Rimini-San Marino "Autostrada del
Titano" Geotechnical study and projects for the
tunnels: S.Giovanni 1 - S.Giovanni 2 - Serra di Sopra.
Client: I.T.S. - S. Marino Period: 1991
- Works concerning alternate track to State Road SS 318 of
Valfabbrica. from State Road SS 3 bis S.G.C. E 45 (at
Lidarno) - to Schifanoia. Project for the S. Egidio
tunnel and geotechnical services Client: Todini Firm
S.r.l. Period: 1992 - in course
- Florence Pisa railway line. Project for the suppression
of level crossings at Km 67+214 - 67+655 - 67+970 -
68+256 - 68+876 - 68+959 - 69+300 - 69+457 - 69+728 -
69+948 - 70+398 - 70+639 and 71+416 through the building
of three underpass at Km 67+070, 69+550 and 70+639, of
three pedestrian underpass at Km 67+970, 68+256, 68+676
and a Road bridge at Km 71+297 (6 bay 30 mt each,
composite I-beam bridge) (Pisa) Client: Coopsette -
Castelnuovo di Sotto (RE) Period: 1992 - 1996
- Geotechnical study and project of the Milan-Bologna high
speed railway line - lots 1 and 2. Client: Aquater (SNAM
Project) - Milan Period: 1992
- Study and technical services for the high speed railway
line Milan-Verona concerning the tunnels in the moraine
amphitheatre of Garda lake. Client: G. Maltauro Firm
S.p.A. - Vicenza Period: 1992
- Project for the tunnels of Milan - Genoa high speed
railway line (included cross tunnel for 24 Km of total
length). Tunnels: Righi - P. Principe - Mount Moro -
Goresina - Geminiano - Boschi - Madonna delle Grazie -
Flavia. Slants: Rio Carbonasca - Ponte dell'Acqua -
Castagnola.(Genoa) Client: Cociv - Milan Period: 1992
- Tender for the road link between Cuneo , Oltre Stura and
Oltre Gesso (tunnels and viaducts). Client: Coopsette -
Castelnuovo di Sotto (RE) Period: 1992
- General study of Brignano tunnel at Salerno Project of
tender. Client: Maltauro Firm S.p.A. - Vicenza Period:
1992
- Metropolitan Milanese - railway connection - lot. 4PA2.
Project for tender. Client: Furlanis General Construction
Period: 1993
- Metropolitan Milanese - railway connection - lot.
4PA2/7P1. Project for tender. Client: Furlanis General
Construction Period: 1993
- Geotechnical and technical project for the new
installation A.C.E.I. and B.A.B. on the railway line from
Rome to Pisa. the work consist on: Project of 25 station
, road and river Underpass; suppression of level
crossing; 5 road extension; one new bridge near the
Bibbona station; Enlargement at two lane of an existing
one lane old arch bridge crossing the railway line at
Castiglioncello. Client: Coopsette - Castelnuovo Sotto
(RE) Period: 1992-1996
- Milan - Genoa high speed railway line, Project of
Brignole variant. (Genoa) Client: Sina - Milan Period:
1996
- Milan - Genoa high speed railway line, Project of the
erecting yard and connected works with the monkey drifts,
Client: Sina - Milan Period: 1996 - in course
- Milan - Genoa high speed railway line, Deepening project
of Flavia tunnel via execution of three monkey drift and
experimental survey (Castagnola Paveto e Vallemme).
Project of the erecting yard and connected works of
"Castagnola" and "Paveto" monkey
drifts, Bailey bridge on "Rio Traversa" and
Bailey bridge on "Rio Vaie" (Genoa) Client:
Sina - Milan Period: 1996 - in course
- Milan - Genoa high speed railway line, Study , Technical
support and Executive project of the portal and the
monkey drift (Genoa) Client: Tecnimont - Milan Period:
1996 - in course
- Provincial Road S. P. n° 9 - n° 10 e n° 13 of Lucca.
Project of general settlement; line adjustment; existing
tunnel moldening; new tunnel; bridges and interchanges;
hydraulic project of river crossed by the roads.
Estimated amount of works L. 34.000.000.000 (Lucca)
Client: CO.AL.PA. Period: 1997 - in course
- Messina - Palermo Motor-way Patti - Buonfornello segment
Lot 27 - 2nd part. Geotechnical and executive Project of
"Colonna" tunnel (Palermo) - Client: Callisto
Pontello firm - Florence Period:1997 in course
- Railway crossing suppression at Km. 276+221, 276+530, 277+102
e 277+351 near Bibbona with the realization of two bridge and two Km of
road.(Livorno) Client: State Railway – Asa Rete Period: 1998 - in course
- Project of the new sistemation of railway station Ostiense e Trastevere
by the execution of two artificial tunnel , e
adeguamento piani di stazione (pensiline, marciapiedi e locali tecnici)
(Roma)Cliente: Coopsette Anno: 1998 - in corso
- Speedway Isernia – Castel di Sangro Variant of ss. N. 17 Appulo Sannitica.
First lot from Km 0+458 of S.P. n. 21 ofi Miranda to Km. 2+500 of S.S. n. 86
“Istonia”.Project of viaduct, tunnel, and various work. (IS) Client: Callisto Pontello
Construction Period:
1998 - in course
- Motorway Salerno – Reggio
Calabria Project: of second trunk - part 5° lot 4° from Km 253+700 to Km
258+200 Cosenza Nord – tunnel Serra Spigola. (CS) Client: SCHIAVO firm Period: 1999 - in
course
Copyright