-
- Study, project and works supervision for the Tavollo dam
servicing the municipalities of Saludecio and Mondaino -
Earth-dam (30 m. High) (Rimini) Client: Commune of
Mondaino Period: 1961-1963
- Study, project and works supervision for the Ventena dam,
for the recharge of the water supply of Cattolica and San
Giovanni in Marignano - Earth dam. (Rimini) Client:
Commune of Cattolica Period: 1967-1969
- Study, project and works supervision for the recharge dam
on river Conca. Earth-concrete dam. (Rimini) Client:
Associated Communes of Riccione - Misano - Cattolica -
Gabicce. Period: 1970-1974
- Study, project and works supervision for the Montemaggio
dam - 32m. high earth dam. (Rimini) Client: L & G -
Rimini Period: 1971-1973
- Study, preliminary and final design of the Pontevecchio
dam on Foglia river. Earth dam (gravity and buttress
central part ) (Pesaro) Client: Reclamation Consortium of
Foglia, Metauro and Cesano River - Pesaro Period:
1979-1991 - works supervision still in course
- Study - preliminary and final design of the Verlunga dam
on river Conca. Earth dam. (Rimini) Client: Valconca
Aqueduct Consortium Period: 1979-1981
- Study, preliminary and final design for the Rio Canale
dam (Esino river basin) - Earth dam. (Ancona) Client:
Reclamation Consortium of river Esino - Pedaso Period
1978 - still in course
- Study - preliminary and final design (in course) for the
Parchiule dam. Metauro river basin. (Pesaro) Client:
Reclamation Consortium of Appennino Pesarese - Pesaro
Period: 1982 - final design still in course
- Study - preliminary and final design (in course) for the
Senatello dam on Marecchia river. 52 m. high earth dam.
(Pesaro) Client: Reclamation Consortium of Appennino
Pesarese - Pesaro Period: 1982 - final design still in
course
- Study, project and supervision of geotechnical works in
connection with settlement of Mercatale dam (Pesaro) -
Gravity dam. Client: Reclamation Consortium of Foglia,
Metauro and Cesano River - Pesaro Period: 1977-1978
- Study, final design, for the settlement works of the
Quarrata dam (Pistoia) - Earth dam. Client: Commune of
Quarrata Period: 1983
- Study, preliminary and final project (in course) of the
Orsaiola dam on Metauro river basin. 47m. high earth dam.
(Pesaro) Client: Reclamation Consortium of Appennino
Pesarese- Pesaro Period: 1983 - in course
- Study and preliminary design, currently in course, of the
Menocchia dam. (34 m. high earth dam) (Ancona) Client:
Reclamation Consortium of river Esino Period: 1983-1991
- Study, preliminary design of the 2 dams on Salso river
(Agrigento) Earth dams. Client: Minister of Public Works
- Department of Palermo Period: 1983
- Study of hydrography and preliminary project of the
marina of Venice (Venice) Client: Nuova Marina Venezia
Lido S.p.A. - Bologna Period: 1976-1978
- Hydrography and fluvial study - preliminary design -
final design and works supervision of the marina of
Cattolica (Rimini) and of the marina of Gabicce (Pesaro)
Client: Commune of Cattolica and Gabicce Period: 1979
- Hydrography and fluvial study and project of structural
works, as well as works supervision of the special works
for the inner harbour of Rimini (Rimini) Client: Commune
of Rimini Period: 1978
- Study of hydrography and project of the structure
extensions of Monfalcone port. (Trieste) Client: Port
Consortium of Monfalcone Period: 1979-1980
- Study of hydrography - preliminary and final design for
the marina at the estuary of Conca river. (Rimini)
Client: M. Marani Firm Period: 1973-1976
- Study of hydrography - preliminary and final design for
the marina of Fano. (Pesaro) Client: Fanum Fortunae
S.p.A. Period: 1977-1979
- Study, of hydrography - preliminary and final design for
the structure extensions of Trieste harbour. (Trieste)
Client: Carnaroli Firm - Fano Period: 1977-1979
- Geotechnical study - works project and geotechnical
supervision for the dry dock of Ravenna harbour.
(Ravenna) Client: Sicos - Turin - on behalf of Tozzi
Bros. S.p.A. Period: 1977-1980
- Study of hydrography , preliminary and final design of
two breakwater near S. Maria di Colonna. (Bari) Client:
Commune of Trani Period: 1994
- Proposal of coastal water study from S. Benedetto del
Tronto (Marche) to Villa San Giovanni (Calabria) to
evaluate the tourist potential. Client: I.N.C. Period:
1988
- Project of coastal settlement near the river Agri
(Matera) Client: Ittica Valdagri - Policoro Period: 1988
- Project of coastal settlement from river "Tara"
to river "Patemisco" and from river
"Patemisco" to river "Lenne"
Estimated amount of works L. 69.946.428.964. (Taranto)
Client: Provincial Administration of Taranto Period: 1988
- Geotechnical study - general advice for the Meda dam.
(Vicenza) Client: CIFA (Furlanis Group) Period: 1987
- Preliminary feasibility study for Portelle and
Caltavuturo dams as well as development of the piping
system at Scillato. (Palermo) Client: Consorzio Schemi
Idrici (C.M.C. - ITER.- Catalano Firm - Fecarotta Firms
Association)
- Final project of the breakwater at Molfetta port. (Bari)
Tender winner: contractor "Consorzio del Mare"
- Barletta. Period: 1992
Copyright
S.g.a.i. S.r.l. di E. Forlani & c. Last revised: May 04, 1999.